Rig mobilization and demobilization are crucial processes in the oil and gas industry that involve the transportation and setup of drilling rigs to and from drilling sites. Rig mobilization includes planning, disassembly, transportation, setup, and inspection, while rig demobilization entails disassembling, transportation, and maintenance before the rig's next use. Efficient execution of these processes is vital to minimize downtime, reduce costs, and ensure safe drilling operations.